| 2010 project pictures |
Storage Tank with Furniture

|
Transfer Skid

|
Caustic dosing system

|
pHÂ 2 pump skid

|
Dosing System

|
Control Backboard

|
3 pump enclosure

|
Zoned area dosing skid

|
Test Rig

|
Coating Skid

|
Chemical Dosing Package

|
Chemical Dosing System for paper Industry
.jpg)
|
Dosing Package mounted on mother frame |
|
|
 |
 |
2 compartment bund for static tanks

|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
Chemical Dosing System for Water Cooling Project |
|

This system was installed on a major blue chip site in the UK.
Its function is to monitor chlorine and conductivity levels in the cooling tower.
The system is enclosed in a GRP cabin with heat and lighting for ease of maintenance |
Turnkey Project for Chemical additions for brewery process |
Unloading container at CSS works  |
Ongoing fabrication and test
 |

|
Dosing container ready for delivery
to site  |
| |
|
|
|
Turnkey Project for Industrial Waste Wipes |
Layout and planning of job  |
On going fabrication
 |
 |
Completed job ready for
transporting to site  |
2009 Project Examples |
2 off 25,000 litre tank installation
 |
PVC serpentine mounted on
stainless steel frame  |
Chlorine Control Skid  |
Booster Skid  |
Installation of Acid Dosing System
built by CSS  |
Chemical transfer and dosing system
 |
Custom fabricated PP bund with inspection facility and 2 pump
enclosure  |
Monitoring and dosing system for a cooling tower application  |
Installation of Acid Dosing System
built by CSS  |
MDPE tank/bund rain skirt with pump
and basic control panel
 |
Example of a control panel designed
and built in our workshop
 |
Classified Hazardous Area Dosing
Skid  |
Project for Paper Industry  |
|
|
|